Chancel and Altar —
Expand and raise entire area from front of sanctuary to the second beam to the level of the current chancel. Raised tier seating for choir and musicians. Install removable communion railing at the front of the chancel area. Pulpit and lectern relocated to platform area. Piano and organ on raised area and realigned. Altar on its own raised level and equipped with rollers to relocate, as necessary. Electrical outlets, etc., adjustments. Choir, minister, assistants, crucifers, and acolytes seated in chairs. Construction performed inhouse.
Total Chancel and Altar: $14,000
Organ —
Lengthen the cable for the organ console. This includes the cost of the cable and the junctions needed to connect the old cable to the new one. An electrician will need to extend or replace the AC wiring that runs from the key switch on the console to the organ blower.
Total Organ: $1,400
Kneeler pads —
platform and fixed kneelers 2” thick and 12” wide
Total Kneeler Pads: $2,300
Chancel and Altar Total Cost: $17,700
Pews-
21 pews—14 at 13’ and 7 at 16’.
Solid red oak seat and back.
$62,473
pew fronts 2 at 16’. $4,254
21 pew ends laser etched $1,915
(42 ends laser etched--$2,380)
floating cushions. $7,480
Total Pews: $76,122
Chairs —
50 chairs 27” wide, 33” high;
3” contour foam seat, 2” lumbar support, underseat book rack, ganging device, finished wood backside, stackable
(main use will be in chancel area)
Total Chairs: $13,460
Stain —
Custom stain color surcharge for matching and applying to furniture
Total Stain: $1,500
Seating Total Cost: $91,082
Sanctuary —
Remove and dispose of existing carpet and flooring. Prep floor, furnish and install new glue down LVT in pew area.
Furnish and install floating LVT on new platform area and transitions. Wood nosing to be installed by platform builder.
Baptismal font to be moved to center of main aisle with pews adjusted for pathway around.
Total Sanctuary Flooring: $27,240
Chi Rho —
Resize and relocate to center of aisle.
Total Chi Rho: $9,082
Commons and Hall —
Remove and dispose of existing carpet. Prep floor, furnish and install new LVT and transitions.
Total Flooring: $42,322
Dossal —
Replace dossal fabric behind cross in front of sanctuary—purchase of materials and professional labor to replace.
Total Dossal: $2,000
Second camera for online streaming
Total Camera: $3,000
Dumpster -
for removal of pews and other project waste.
Total Dumpster: $500
Storage pod/container for duration of project for furniture (month rental)
Total Storage: $140
Other Total Cost: $5,640